City of Warren Working Against Rat Problem Along I-696 Corridor
Jer Staes
Detroit, MI
Player
Watch & listen on
Show notes
The city of Warren says they’re working to combat a rat problem along the freeway that the city says is caused by construction.
The city says that since April they’ve deployed 128 traps along the fence line of I-696 at a cost of $125,000.
A contractor is checking the traps every two weeks along the six mile stretch.
Warren is also sending residents new 90-gallon trash cans so that residents’ trash is contained.
This story first appeared on the Daily Detroit podcast.
Share
Chapters
No chapters for this episode.
Chapters
Transcript
No transcript for this episode.
No matching lines.
Hosts & Guests